The mixtures of power lime and cinder were used as PRB materials to study the feasibility of in-situ remediation of acid seepage water from uranium mill-tailings.
使用消石灰与炼锗煤渣混合物作为PRB材料,进行原位处理铀水冶尾矿酸性渗滤水的可行性实验研究。
2
The alloy was the main product of a aluminium alloy mill, but the waster rate of finished 6063 aluminium alloy product was always very much because of cinder inclusion.