It has been used to forecast the LMP at lowloadperiod, medium load period and peak load period in American PJM power market.
对美国PJM电力市场的峰荷时段、腰荷时段和低谷时段的LMP实时电价分别进行了预测。
2
Antifreezing is always a notable problem in the start-up in winter, shutdown process and lowload operation period of air cooling condenser of large size direct air cooling unit.
大型直接空冷机组空冷凝汽器在冬季启动、停机过程以及低负荷运行阶段的防冻问题尤为突出。
3
On the basis of experiment research, the internal force of high strength bolt joint area of steel beams and concrete walls within steel profiled bar was analyzed under the lowperiod cyclic load.