In this article, authors state construction technology study achievements gained in construction of the Huxiuling double lines multi-arch tunnel and their application.
本文就修建岵岫岭双线连拱隧道过程中开展的施工技术研究成果和应用情况做了介绍。
2
The paper introduced the choice and construction process of loess multi-arch tunnel middle wall, analyzed monitoring and measurement of strengthening the middle wall for reference.
介绍了在黄土地区双连拱隧道中墙的选择及施工过程,并分析了如何加强对中墙的监控量测等。
3
The study of construction stimulation and control of multi-arch was run to solve tunnel dynamics construction mechanics.