The pressure builduptest must shut the well, so it will effect the production and the development benefit.
压力恢复测试必须关井,客观上影响油田的油气产量和经济效益。
2
Builduptest is now recognized to be the most effective method for evaluation of hydraulic fracturing performance.
目前对水力压裂效果评价最有效的方法是压力恢复试井。
3
The fixed-point and the non - fixed-point builduptest at full development of oilfield can't accurate test stability flowing pressure that results in deviation.