Teams must be careful that the mud does not raise pressure too high and cause possible damage to the well pipe.
工程人员必须保证压力不能过大,避免引发对油井管道造成可能的破坏。
2
On May 26th BP started to pump heavy drilling mud into the blowout preventer, the set of valves at the top of the well to which that broken pipe is attached.