The study shows that the reliability of the loading station is affected by the time of loadingtruck and waiting locomotive.
研究结果表明,装车站作业过程的可靠性主要受装车作业时间、机务作业时间的影响。
2
This article introduced a regular loadingtruck and control technology which widely applied to chemical industry and had certain reference application value.