Is there a line plan or production loadingschedule for at least one month in advance?
至少有最近一个月的生产计划或生产通知单?
2
By Analyzing the economy for consolidation and the strength of soft clay during consolidation, the optimal design of the parameters of sand well and the loadingschedule (project term) is proposed.