It introduces the problems during construction of the cast in situ concrete pile embedded in rocks for sand loadingberth of Fuzhou Port bulk cargo (river sand) wharf and the countermeasures.
文章介绍福州港散货(河砂)码头工程装砂泊位嵌岩灌注桩施工中的难题及处理对策。
2
Notice of readiness to load shall be tendered with clean holds hatch open and ready in all respect to load at any time after vessel has arrived at loading port whether in berth or not.