Contact supplier and Loadingarrangement for subcontract.
联络供应商并安排公司的转包合同。
2
According to forces applying on the disk-shaped cutters of whole-section tunneler, cutter arrangement rules are established with even loading on the disk and null traverse load.
根据全断面岩石掘进机盘形滚刀工作时的受力,建立了刀盘受力均匀且横向载荷为零的盘刀布置规律。
3
The loading principle, loading project and rule of measuring-point arrangement for bridge static test are presented.