There is a point in the loadcurve where response time degradation is directly due to the number of requests the application is processing.
负载曲线中有一点表示响应时间的增加的直接原因是应用程序处理的请求的数量。
2
The typical loadcurve which is selected for evaluating the overload ability of traction transformer must be reasonable, it should reflect accurately the operation status of traction transformer.
The reactive compensation by capacitor banks for substations tends to make the loadcurve change, which may result in shifting of the economic operation range of the transformer.