The mix proportion test carried out before construction and quality inspection conducted afterconstruction are introduced, which can assure the engineering quality of piles made cement-soil material.
为保证粉喷桩工程质量,文章介绍施工前进行的配比试验和施工后进行的质量检测。
2
After accomplishment of the construction of cutoff wall, water pressure tests and quality inspection were conducted, and the results indicate that the dam meets the anti-seepage request.
防渗墙施工结束后,进行压水试验和质量检查,满足主坝防渗要求。
3
Afterconstruction of the insulation lagging is completed and accepted by inspection, operating the insulated layer shall be carried out timely.