So we should study the liquefiedarea of shield tunneling in order to adopt a corresponding measure.
因此,有必要对这些土层的液化情况进行研究,以便采取相应的工程技术措施。
2
The calculation results show that the primarily liquefiedarea is near water line and the secondary is starter dike.
通过计算分析得出,上游坡面水边线附近区域最易液化,其次在初期坝附近。
3
Chevron (CVX) is also developing a liquefied natural gas (LNG) project at Wheatstone in the same area that will produce an estimated 8.6 million tons of LNG annually.