Check the indication of pressure gauge on central landing dear strut.
请检查中起落架减震支柱指示。
2
The load reacting unit (9) may be connected between a forward end of the arm (4) and the upper portion (2) of the shock absorber strut to make the gear act as a semi-levered landing gear.