The critical path controlling the first power generation of Sanbanxi Hydropower Station is the construction of the diversion tunnel and dam as well as the initialfilling of the reservoir.
三板溪工程导流洞与大坝施工以及水库初期蓄水是控制首台机组发电工期的关键线路。