It also shows that the average creep displacement value of the cofferdam structure is 2-3 times of the initialdisplacement.
围堰结构的后期流变位移平均值是流变初期时位移的2 ~ 3倍。
2
The influence of initialdisplacement on load bearing capacity and critical load of steel concrete composite structure is discussed.
讨论了钢材的初始挠曲对钢混凝土连续组合梁的极限承载力与失稳屈曲临界荷载的影响。
3
Based on the assumption of random installation deviation, the finite element met hod analyzing the initialdisplacement and stress of grid structures was set up.