The initialcorrosion time may be decided by structural protection degree and penetration rate of corrosive agents.
而初始时间(或去钝时间)的确定则取决了结构防护程度及有害介质离于的渗透速率。
2
The target reliability level that the time of reinforcement initialcorrosion in concrete structure exposed to chloride environments is proposed in this paper.