The improvement measures is to change ideas, strengthen the communication with design professional, and revise budget requirements and budgetquota, etc.
改进措施主要是转变思想观念、加强与设计专业沟通、修订概算编制规定及概算定额等。
2
Abstract: Hydraulic engineering design budget must be based on the design engineering, construction management planning, budget preparation and budgetquota.
摘要:水利工程设计概算必须依据设计工程量、施工组织设计,按概算编制规定及概算定额进行编制。
3
It also discusses how to determine the project cost through analysis and calculation by (utilizing) the existing BudgetQuota issued by the Construction Department.