The freeway tunnel is an inertial plant with lag, and is exposed to a lot of uncertain disturbance.
高速公路隧道是一个带滞后的大惯性对象,存在许多不确定干扰。
2
The approach is called lead and lag correction which has been adopted to correct the stabilization loop of roll-isolated fiber optical gyro strap-down inertial navigation system (RIFOGSINS).