The connection of the two bodies is built around a sequence of full and empty, with a courtyard and an elevator handled as transparent box, as the centerpiece of the joint.
A method of embedded pipe and outlet box was adopted in the joint grouting system of Wanjiazhaidam.
万家寨水利枢纽大坝接缝灌浆系统采用预埋管路和出浆盒方式。
3
The seismic capacity of the box-shaped joint in the reinforced concrete mega-frame structure system is studied, and the finite element analysis is done with ANSYS .