Due to support or increased excavation volume caused by lining, Party a shall measure again and converted it to total length of the tunnel.
因支护或衬砌增加的开挖量由甲方代表按实计量并折算成隧道延米计价。
2
The calculation of structural load on the lining of tunnel with shallow overburden shows that the load on composite lining will be shared by primary support and secondary lining.
隧道衬砌在浅埋段的结构荷载计算表明,复合式衬砌中的初期支护和二次衬砌一般要共同承担荷载。
3
This paper introduced construction measure and features of concrete brickwork lining construction for combining-style steel bearing reinforced bar framework support mould in tunnels.