Result shows that parameters are controlled in allowable range, such as shield posture, oil pressure of shield jacks, displacement of down link, settlement of municipal pipelines and so on.
结果证明,盾构姿态、盾构千斤顶油压、下行线隧道位移、市政管线沉降等参数均控制在允许范围内。
2
With the allowable maximum ground settlement as target value, a dynamic optimization model is designed to draw up the strategy(technical measures) controlling the effect of tunnelling on environment.