The invention relates to a bolting and welding combined double-amplitude pulling plate cable beam anchoring structure of a cable-stayed bridge.
本发明涉及一种斜拉桥栓焊组合式双幅拉板索梁锚固结构。
2
The method introduces the wire dividing plate in the hot-cast anchor to improve the casting performance of the hot-cast anchor and the anchoring performance of an inhaul cable of the hot-cast anchor.
本发明在热铸 锚中引入分丝板的方法,以改善热铸锚的浇铸性能,提高热铸锚拉索的锚 固性能。
3
Conventional plating methods are based on the use of an adequate number of anchoring screws to press the plate against the bone with high compressive forces, creating a stable bone-implant connection.