The vertical and parallel relations of the trench with drill drift are summarized by the bottom structure disposal design on inclined orebody footwall.
According to the mechanics analysis method of BHA and the real work state of drill string in inclined straight well, a mechanical model of BHA is presented.
根据现有钻具力学分析方法和斜直井钻具的实际工作状态,建立了斜直井下部钻具力学分析模型。
3
On the basis of energy method, the possibility of drill stem buckling in inclined straight hole is studied.