To analyze the effect of the blinddrainage system on the engineering characteristics of the ground improvement by gravel pile, the contrast tests were carried out on roadbed testing segment.
Air blower aeration was adopted in Shaoxing Wastewater Treatment Plant, where exist some disadvantages, such as the falling-off of blind lid from aerated pipe and malfunction of drainage system.