During initial reservoir development period, the result of well stimulation using conventional fracturing, limitedentryfracturing and mud acidizing is poor.
油藏开发初期,曾采用常规压裂,限流压裂和土酸酸化等增产措施,但效果不理想。
2
Therefore, the number of perforation and the formation properties should be considered in designing the limitedentryfracturing for better estimation of the fracture parameters and the improvements.