The cable anchoring zone on the cable tower of the Wuhu Yangtze River bridge is of pre stressed reinforced concrete box structure without intermediatebeam.
芜湖长江大桥桥塔拉索锚固区为预应力混凝土箱形结构,无中间梁,索塔锚固区为单箱单室结构。
2
Rotor blade connection according to claim 1 wherein each intermediate layer of the individual dampers is fixed to the support beam structure by a single fastening point.
转子叶片方面,根据权利要求1,其中每一个中间层的个别阻尼器是固定的支持梁结构,由一个单一的紧固点。
3
Intermediate driving way is put forward for the first time and can solve influence of deflection and edge effect come from rail beam on mechanical and electric performance.