An analysis of why the bleeding check valve of a 600 MW steam turbine-generator set couldn't readily shut during testing is being presented, together with means of improvement.
The testing method of acquiring the data guide lines is based on provision of GB8076-1997 including bleeding rate, slump, concreting time. ratio of compressive strength. shrinkage rate and so on.