On the basis of monitoring results of water quality and benthos, the impacts of two generic bulk berths construction in Nantong Port on downstream water quality of water intake were analyzed.
The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.
地下厂房进水口高边坡稳定是龙滩水电站建设必须解决的重大工程技术问题。
3
The steel plate boxes were applied in the construction of Heihe municipal water source intake work as cofferdam.