Finally puts forward safety attentions should be noticed by operators during generator leadingphase operation.
最后提出了运行人员在发电机进相运行中应注意的安全事项。
2
The analysis indicates that large turbine-generator leadingphase operation can improve the reactive power load distribution and the quality of power supply effectively.
试验分析表明,大机组发电机进相运行可有效改善电网无功潮流分布,提高电网供电质量。
3
Following delivery of the CH147F training suite in early 2014, phase two of the contract will commence with CAE leading the in-service support for the CH147F aircrew training program.