Connection of lead and bushing shall be tight and correct, bushing should be in good condition.
引出线与套管的连接应牢靠,接线正确。套管应完好无损。
2
Cell connectors and terminal post burning must be done in such a manner that there is complete fusion of the post strap top and the cover leadbushing with the connector ring or terminal post.
连接条和接线柱的焊接必须使极柱顶部和盖子的铅衬套与连接条环口或接线柱完全熔焊牢固。
3
The conductive loop partial overheat fault caused by improper design and installation of the through lead wire in transformer bushing is analyzed. The preventive measures are presented.