Crews are slowly pumping heavy drilling mud into a cap on the top of the well, to push down hydrocarbons that are already present in the well pipe.
工程人员正在缓慢地将特殊泥浆注入井口上的控油罩,将油井管道中已经形成的碳氢化合物压在下面。
2
The fitting of a heavy, three valve-cap on the Macondo oil well on July 15th marked the opening of just such a new act in the drama of the Deepwater Horizon, its loss and its aftermath.