Design condition and debugging data of heataccumulator are introduced.
介绍了蓄热器的设计条件和调试数据。
2
A by-pass capillary tube was added on the discharge pipe behind the four-way valve and a tube was added in an accumulator in a heat pump system to solve the problem.
在热泵系统四通换向阀后的排气管上加旁通毛细管和在气液分离器中加过冷管。
3
This paper introduced the operating principle, design and check of heataccumulator used in the boiler having a great fluctuation in load.