Ctc maximum head is suitable for pump discharge to butanol handling facility.
用户确认泵出口去丁醇处理装置的最大扬程是合适的。
2
The diversion tunnels of the Shuibuya Project feature high head, big discharge, long tunnel line and complicated geologic conditions.
水布垭导流隧洞具有水头高,流量大,洞线长,地质环境差等特点,因而技术问题较多,难度较大。
3
According to hydraulic principle, the change of efficient water head, discharge coefficient and discharge of orifice along porous pipes have been discussed and checked by experiments in this paper.