PSASP applied in the paper, the problems raised by the Shandong high-voltagetest hall connected to the grid are discussed, and then the solutions are put forward.
Inspect, record and operate highvoltage equipments status, regular turn over highvoltage wire and testhighvoltage switch.
检查、记录和操作高压设备状况,定期转换高压线路和切换试验操作。
3
This paper details personal security problems in highvoltagetest and provides detail scheme and application of telecontrol technology in highvoltagetest.