The deep well coal road cable of small diameter hole and high pre-tension structure and craft were studied according to the condition of high stress and composite roof in Fengcheng coal field.
The platform was under the control of an Israeli Air Force ground controller, who is believed to have lost contact with the UAV after which it lost altitude and hit a high-tensioncable.