The tenth cycle core of GNPS is the second cycle with 18-month fuel cycle after increasing fuel enrichment.
大亚湾核电站第十循环堆芯是自提高燃料组件富集度后实现18个月燃料循环的第二个循环堆芯。
2
The work organizing process integrated with risk analysis of Guangdong Daya Bay Nuclear Power Station (GNPS) is depicted.
描述了贯穿于广东大亚湾核电站日常工作组织过程始终的风险分析的概念和方法。
3
Having taken a firm step in localizing nuclear power equipment GNPS gives a boost to the overall improvement of capability of China's nuclear power industry.