In addition the results of cold and hotposition tests and their analyses are presented.
另外还介绍了冷热态试验的结果和分析。
2
The ignition delay time was studied on the hotposition bench that could stimulate combustion process of traveling grate furnace.
在可模拟链条炉中燃烧过程的热态实验台上,研究了块粒型煤的着火时间。
3
Finally, it is indicated that the air velocity and pulverized coal concentration uniformity regulating in W-firing boilers should be carried out in hotposition to meet the demand of combustion.