Thus the compensation for the removal cost of the crushing station is achieved and the unit haulagecost is rather low.
这样破碎站的转移成本补偿可以被计算出来,单位运输成本也比较低。
2
Based on expression (8), the removal distance of the crushing station is 536 m Based on expression (13), the relation between the haulagecost and the removal distance can also be obtained Fig.
根据表达式(13)可以得到转移距离的运输成本和转移距离之间的关系(如图3)。
3
At the same time, the feasible ore and rock haulage systems are, in detail, compared in respects of technological process, land requisition, capital investment, operation cost, etc.