The cooling chamber (15) of the continuous firing furnace (10) is installed with guiding passage (1) and exhaust passage (2).
在连续式烧成炉(10)的冷却室 (15)设有导入通道(1)和排气通道(2)。
2
The furnace can alternatively be supplied with a back exhaust when waste gas contact on charge material must be avoided.
当必须避免废气与装料接触时,这种炉子需更换一个后式烟囱。
3
Recycle and utilization of waste heat in exhaust fume of industrial furnaces is the efficient way enhancing furnace heat efficiency and saving fuel used by furnace.