If the unit needs to stop the incinerator, then after blowing, outage send, induced draft fan for stuffy furnace.
如机组需要停炉处理,则吹扫完成后,停运送、引风机进行闷炉。
2
The baking process of the baking furnace for making anodes is modified in order to meet the demands for operation conditions, that is the fuel and draft level.