Three Gorges Project-Upper and lower lock heads for the temporary ship lock Ship lock hydraulicsystemassembly.
三峡工程—临时船闸上闸首、下闸首船闸液压系统总成。
2
Be able to inspect process like production assembly and commissioning of hydraulic control system as per requirement.
能按设计要求对液压控制系统的装配、调试等生产过程进行检验。
3
The methods of the shell oilway design, check, assembly application and the design specification of aeroengine HydraulicSystem Actuator by using UG were introduced.