Siting of a sludge treatment system at a power plant, where high-pressuresteam generated by the SCWO process could be fed into a steam header, would provide greater economic benefit.
In high different pressureprocess condition, if the valve type selected were not correct, erosion and corrosion would occur in the trim, especially in steam systems and water spraying systems.
The weakness of the boiler highpressuresteam sterilizer is put forward. The development process and actual application value of the hot steam electrical generator is mainly introduced.