It included the processes of building, scheduling and up-linking instrument loads, managing the spacecraft in a fully automated mode, and verifying ground system and operational products.
它包括建立流程、时序安排和卫星上行链路仪器负荷,以全自动模式管理太空船,验证地面系统和运行产品。
2
The converted commercial airliner is equipped with an instrument that can measure a hurricane’s wind profile from ground to the aircraft’s height.