In the early years of introduction of FGD technology, a spare absorber was included to allow full-loadoperation with one absorber out of service.
在引进FGD技术的早年,一种多余的吸收剂被包括退出运行用一种吸收剂给充分负荷运行。
2
The ethylene plant of Jilin Chemical Industry CO. Ltd. was expanded in 2005 and put into full-loadoperation in 2006. The plant was also tested at fullload.