After researching hydraulic project administrative funds budget and controlplan, Constructs the new hydraulic project overhead charge budget system.
在研究水利工程管理单位经费的预算和控制思路后,构建新的水利工程管理费用预算体系。
2
The hydraulic condition and sludge character of MBR are analyzed, the methods to control depositing layer with different arrangement plan of membrane module are expounded.
分析了MBR运行的进水要求和污泥特征,阐述了不同膜组件布置方式下的沉积层控制方法。
3
Aspected of system principle of work, hydraulic pressure actuation and PLC controlplan so on have carried on a more exhaustive elaboration.