Each node requires two addresses on the compute network: one for the compute address and another for the Baseboard Management Controller (BMC), which is used for hardware monitoring and power control.
If you have no hardware power control (no BMC IP address is set), start by flashing the BMC firmware, which enables you to set the IP address at the same time.