Taking the geological condition in the harbourdistrict Jingtang Port as the model, the detail analysis on lowering water level by large diameter well point are given in the paper.
The construction conditions of diaphragm wall wharf, Jingtang HarbourDistrict are introduced and analysis on the proposal for the covered type of deep water sheet pile wharf are made in the paper.
介绍了京唐港区地连墙码头的建设情况,并对深水遮帘板桩码头方案进行分析。
3
It was inaugurated in 2008 and ACTS as a tidal barrier to keep seawater out, thus turning the island's most populated district into a water-catchment area and the harbour into a reservoir.