Its top must be higher than dam saturation line's exit point, and the extent exceeded must ensure the saturation line is no less than 1.5 meters below local freezingdepth.
With the geometrical size and temperature exchange value of the mine shaft, the possibility of the cracking on the mine freezing shaft would be increased with the depth of the overburden.
在井筒的几何尺寸及温度变化值确定的情况下,冻结立井随着表土段深度的增加,破裂的可能性在随之增大。
3
Using the finite differential method we calculate the temperature field and frozen depth of pavement proper when the road is freezing by degrees with moisture migration.