This is an experience report on over ten years chemical cleaning of high pressure feedwaterheater at Shanghai Baoshan Power Station.
这是一篇上海宝钢自备电厂十年来,高压给水加热器的化学清洗的情况报告。
2
A model is established to study how feed - water excursion affects the coal consumption, considering the relations between the temperature and the flux of the feed - water flowing out the heater.
建立了母管制系统给水偏移对煤耗量影响的数学模型,并考虑了加热器出口水温与给水量的关系。
3
This pump takes feedwater sent from feedwater booster pump and supplies it into the steam generator through the high-pressure heater continuously.