Based on the erection period arranged between SELLER and BUYER, the SELLER shall delegate his personnel to supervise erectionworks in accordance with terms of this Contract.
根据买方和卖方共同安排的安装周期,卖方应按照合同条款委派他的人员来监督安装工程。
2
Together with SELLER's erection supervisor, inspect mechanical and electrical works and prepare pre-commissioning report(s) to include required corrections and/or additions prior to Commissioning;
与卖方的安装主管人一起,检查机器和安装工程并准备试车前的报告,包括试车前所需要的纠正和/或增加物;
3
"Works" shall mean the Plant including the erection and other work to be carried out by the Contractor under the Contract.